×
 

Railway Cancels Vasco Da Gama-Kulem Special Trains For Track Work

Cancellation aimed at facilitating ongoing track-doubling work

South Western Railway has announced the temporary cancellation of Vasco Da Gama-Kulem special passenger train services to facilitate track-doubling work. According to the railway authorities, the services will remain fully cancelled for a period of 26 days, from September 9 to October 4. The decision has been taken to enable the required infrastructure work to be carried out safely and efficiently along the railway section. Passengers planning to travel on the affected services during this period have been advised to take note of the temporary changes to the train schedule.

The cancellation is linked to ongoing efforts to expand railway infrastructure through track-doubling work. Doubling railway lines can help increase the capacity of a route by allowing trains travelling in opposite directions to operate more efficiently. Such projects are generally undertaken to reduce congestion and improve the movement of passenger and freight services. The temporary withdrawal of train services allows railway authorities and construction teams to undertake work without the additional operational constraints associated with running regular trains on the affected section.

The affected services are the Vasco Da Gama-Kulem special trains operated under South Western Railway. These trains will not operate during the specified 26-day period beginning September 9 and ending October 4. The cancellation is temporary and has been announced specifically in connection with the track-doubling project. Passengers who regularly use these services will therefore need to check alternative travel arrangements during the period in which the services remain suspended.

Also Read: Eastern Railway Cancels More Trains After Fresh Subsidence Disrupts Farakka Track Work

Railway infrastructure projects can require temporary changes to passenger services, particularly when construction work involves railway tracks and other operational areas. Safety remains an important consideration while such work is being carried out, as construction activity and train operations may otherwise interfere with each other. The temporary cancellation is intended to provide the railway authorities with the necessary working conditions to undertake the track-doubling activities. Once the work period is completed, the affected services are expected to be considered for resumption according to the railway schedule.

The cancellation could affect passengers travelling between Vasco Da Gama and Kulem during the affected period, particularly those who depend on the special services for local or connecting journeys. Travellers are expected to verify the availability of alternative trains and other transport options before beginning their journey. Railway passengers may also need to account for changes in connecting services because the cancellation could affect planned travel schedules. The announcement therefore serves as an advance notice for passengers to make necessary adjustments to their travel plans.

South Western Railway’s temporary cancellation of the Vasco Da Gama-Kulem special trains will remain in force for 26 days as track-doubling work progresses. The affected services are scheduled to remain cancelled from September 9 through October 4, after which further information on their operation will depend on the progress of the infrastructure work. The track-doubling project is part of efforts to strengthen railway infrastructure and improve operational capacity. Passengers using the affected route are advised to check the latest railway timetable and service information before travelling during the cancellation period.

Also Read: VP Radhakrishnan Highlights Arunachal Pradesh’s Role In India’s Border Security

 
 
 
Gallery Gallery Videos Videos Share on WhatsApp Share